Zimbabwe 100t/d gold project,We have a very strict management for each project, and one people will be responsible for each project from the beginning to the end,which can make sure the whole process smoothly. Design institute will start from engineering design, precise positioning technology and its products, not only guarantee the technology, but also reduce customer cost and choose the best process.
We have a very strict management for each project, and one people
will be responsible for each project from the beginning to the end,which
can make sure the whole process smoothly.
Design institute will
start from engineering design, precise positioning technology and its
products, not only guarantee the technology, but also reduce customer
cost and choose the best process.
At the same time, we have a very
strict quality management for equipment production,and have passed the
ISO 9001:2008 international quality certification. Several large
automatic CNC cutting machine, CNC automatic welding machine, 5 meters
CNC vertical lathe, CNC lathe, CNC boring machine, and has the longest
15 meters large lathe in Shandong, all of this can guarantee the
accuracy of the equipment and the appearance of fine quality.