Project Process
Raw ore by mining equipments to gold car, ore bin with grizzly prevent large ore into the washing sieve , by high pressure water washing ore in a sieve, soil, gold particles to separate.Oversize product by belt conveyor transport directly to the factory of waste dump, undersize chute after inspired to enrichment, and then fixed chute to further recovery of valuable gold, the recovery rate of gold particles can be as high as above 70%.
Manufacturing
We have a very strict management for each project, and one people will be responsible for each project from the beginning to the end,which can make sure the whole process smoothly.
Design institute will start from engineering design, precise positioning technology and its products, not only guarantee the technology, but also reduce customer cost and choose the best process.
At the same time, we have a very strict quality management for equipment production,and have passed the ISO 9001:2008 international quality certification. Several large automatic CNC cutting machine, CNC automatic welding machine, 5 meters CNC vertical lathe, CNC lathe, CNC boring machine, and has the longest 15 meters large lathe in Shandong, all of this can guarantee the accuracy of the equipment and the appearance of fine quality.