Project Process
Signing contract date:April,2014
Production Time:Jan.2015
Cooperation:Beatification research,engineering design,equipment manufacture,installation and commissioning,personal training.
Process
The material is for cyanide tailings,gold grade is 0.6-1.0g/t,the tailing will be made to pulp- deslagging- flotation, the concentrate we got from flotation will go to thickener,leaching tanks,desorption and smelting system,the flotation capacity is 1000t/d,and the leaching capacity is 100t/d.
Manufacturing
We have a very strict management for each project, and one people will be responsible for each project from the beginning to the end,which can make sure the whole process smoothly.
Design institute will start from engineering design, precise positioning technology and its products, not only guarantee the technology, but also reduce customer cost and choose the best process.
At the same time, we have a very strict quality management for equipment production,and have passed the ISO 9001:2008 international quality certification. Several large automatic CNC cutting machine, CNC automatic welding machine, 5 meters CNC vertical lathe, CNC lathe, CNC boring machine, and has the longest 15 meters large lathe in Shandong, all of this can guarantee the accuracy of the equipment and the appearance of fine quality.